We offer to your attention solid fuel pyrolysis boilers for air heating of the KFPV series, the principle of operation of which is based on the burning of wood
gas, which is released in the process of smoldering firewood.
Due to the fact that combustion proceeds from top to bottom and the main heat exchanger is located in the lower part, maximum heat transfer and heating of the coolant occurs.
The fuel for these boilers is: firewood, woodworking waste, fuel briquettes, straw, husks, corn cobs, etc. (
except for coal!)
These boilers heat rooms up to 6000 cubic meters!
Boilers of the KFPV type are intended for heat supply of individual residential buildings, industrial premises, warehouses, car washes, gyms, livestock farms, poultry houses, greenhouses and other large premises, and are also used for drying wood, grain, mushrooms, berries, medicinal plants.
Technical characteristics of the pyrolysis boiler for air heating KFPV-150
Parameters Unit.
Heat output, kW, 150
Volume of loading chamber (gas formation), m3, 0.84
Working air temperature, 0C, 50-120
Efficiency at fuel humidity, %:
20% - 90
40% - 82
Nominal rarefaction for the boiler (no more), Pa, 40
The temperature of the outgoing gases (not less), 0С, 150
Electric power consumed, kW, 1.2-1.6
Supply voltage, V, 220
Chimney diameter, mm, 200
The volume of the heated room, cubic meters, 6000
The maximum length of firewood, mm, 1000
Overall dimensions
(//tractor-service.com)
Depth 1900
Width 950
Height 1930
Weight, kg, 1650
Firewood, briquettes, which is used.
Basic equipment of pyrolysis boiler for air heating KFPV-150:
- firebox, lined with fire-resistant brick SHA-5, size, mm: 1000x700x1200, volume - 0.84m³;
- Heat exchanger pipes (thickness 3.5 mm);
- heat exchanger housing (boiler room steel, thickness 5 mm);
- boiler control automation (manufacturer – Poland).
Additional equipment (upon agreement with the customer):
- heat-saving cover of the heat exchanger, made of basalt wool;
- fan PC 4-75 No. 4, 3000 rpm, 4 kW/h.
The warranty service for the boiler is 12 months, electrical and electronic components - 12 months.
Equipment delivery terms: 14-20 days.
Each boiler can be equipped with a small fraction burner, which works on any solid fuel (pellets, sawdust, sunflower husks, any agricultural waste with any ash content).
We invite trading and assembly organizations to cooperate.
It is possible to install a burner that works on waste oil and any liquid fuel.
Our site: http://kfk.com.ua/