We will manufacture and install
containers (of different volumes and configurations) for unloading grain onto the railway track.
We carry out construction work on the installation of bunkers for the shipment of
grains onto wagons.
Bunkers can have a volume from 40 to 500 m³, which allows you to load a wagon through all hatches at the same time.