Hawk - herbicide and desiccant.
Maximum efficiency even under difficult conditions
Active substance: Glyphosate potassium salt, 441 g/l, in acid equivalent of 360 g/l.
Preparative form: aqueous solution
Purpose: continuous action herbicide and desiccant, blocks the synthesis of aromatic amino acids.
Container: 20 l., the price is indicated for 1 l.
Manufacturer: Monsanto.
The mechanism of action of the herbicide Yastrub:
This drug has a non-selective effect, that is, it destroys absolutely all plants on the area treated by it. At the same time, this herbicide has a unique formula that does not harm cultivated plants, which allows it to be used not only before sowing the fields, but also after that - until the seedlings of the crop. In addition, the Yastrub herbicide can be used as a
desiccant, to accelerate the ripening of crops.
Main advantages:
Unique formulation - 441 g/l
Any crop can be sown 1-3 days after processing.
Spraying can be carried out 1 hour before expected rain
Efficiency is not affected by a decrease in air temperature after spraying (from +2°С to +30°С)
You can work on dew.
(//tractor-service.com)
Application regulations: as a herbicide.
* Culture, treated object - Rate of consumption of the drug, l/ha - Object against which it is treated - Method, time of treatments, limitations - Maximum frequency of treatments
* Fields intended for sowing (planting) cereals, potatoes, corn, sugar beets, soybeans, rapeseed, flax,
sunflowers, vegetable and melon crops, grasses and seeds
-3.0
-Annual and perennial grasses and dicotyledonous weeds
- Spraying of growing weeds in the fall after harvesting the predecessor or in the spring 2 weeks before tillage
-1–2 (the second - if necessary)
Regulations of use: as a desiccant.
* Culture, treated object - Rate of consumption of the drug, l/ha - Method, time of processing, restrictions - Method, last. processing before harvesting
of harvest - Maximum number of treatments
* Cereals
-3.0
- Spraying of growing weeds in autumn after harvesting the predecessor or in spring 2 weeks before soil treatment
-14 days
-1–2 (second - if necessary)